Wood Frame Bid Calculator

Adjust square footage — numbers update live

TOTAL BID
$59,655
2,400 SF
500 SF12,000 SF
Lumber & Sheet Goods$11,640
Materials Total$14,201
Labor$29,760
Overhead (15%)$6,594
Subtotal$50,555
Markup (18%)$9,100
TOTAL BID$59,655

Screenshot this number — it's yours to use today. Unlock 40+ more templates →

Every socket in the right size. Every time.

Hardhat hands contractors the spreadsheets, takeoff templates, and bid calculators that survive Monday morning — not theory, not courses. Just tools your crews will actually open.

⚙️

40+ live calculators for framing, concrete, MEP, and finish work

📋

Takeoff templates pre-loaded for commercial and residential bids

📈

Members win 31% more bids in their first 60 days

No credit card for the free estimator · Cancel membership anytime

Tools that live on jobsite laptops,
not in training libraries.

40+ calculators and templates built by estimators who have priced commercial ground-up, TI work, and residential custom — all of it.

Estimating

Lumber Takeoff Sheet

2,800+ downloads

BF calculations, waste factors, and species pricing — pre-loaded for stick frame and mass timber.

ItemQtyCost
2×6 Studs @ 16" OC840 LF$1,176
LVL Beam 3.5×9.548 LF$864
Sheathing 7/16"62 sheets$868
Preview template
Labor

Crew Productivity Calculator

Saves ~4 hrs/bid

Input your crew size and trade — outputs daily production rates and labor cost per unit.

ItemQtyCost
Framing crew (4 man)340 SF/day$18.40/SF
Overtime factor1.5×$27.60/SF
Preview template
Markup

Markup % Optimizer

Used in 1,400+ bids

Plug in your overhead, desired net margin, and local market — get the markup number that keeps you whole.

ItemQtyCost
Overhead loaded rate15%
Target net margin12%
Recommended markup31.0%
Preview template
Bidding

Bid Comparison Template

94% member retention

Side-by-side subcontractor comparison with scope gap flags — so you're not comparing apples to drywall.

ItemQtyCost
Sub A — Concrete$42,800SCOPE GAP ⚠️
Sub B — Concrete$51,200COMPLETE ✓
Preview template
Takeoff

Commercial Takeoff Checklist

87 scope items

87-line scope checklist that expands per CSI division — nothing falls through the cracks on a hard bid.

Division 03 — Concrete
Division 05 — Structural Steel
Division 06 — Wood Framing
Division 09 — Finishes
+ 83 more divisions...
Preview template

Stop guessing your markup. Calculate it.

15%

Field trucks, insurance, office, estimating time

12%

What you take home after everything is paid

Your Markup Should Be

Apply this to your cost total before presenting to the owner

37.0%
Direct Costs
73%
Overhead
15%
Net Margin
12%
"
I had been marking up 20% for three years. Hardhat's markup calculator showed me I was leaving $60k a year on the table — I was covering overhead but not margin. First bid I ran with the right number, I won it.
DK

Derek Kowalski

Owner-Operator · Kowalski Framing · 6-person crew · Chicago, IL

"
Our estimating team was rebuilding the same Excel every bid cycle. Hardhat's templates cut our bid prep from 14 hours to under 4. We submitted 22 bids last quarter. We never could have done that before.
RP

Rachel Pham

Senior Estimator · Meridian General Contractors · 85 employees · Houston, TX

31%

Higher bid win rate

Average improvement for members in their first 60 days, based on self-reported bid logs

Real bids. Real numbers. Real crews.

Construction estimator reviewing blueprints at a job trailer desk
$1.2M
First commercial job won
12-person crew
Priced my first $1.2M commercial job using the Hardhat bid template. Walked into that pre-bid meeting with numbers I trusted. Won it.
MT

Marcus Trevino

Principal Estimator · Trevino & Sons Construction · San Antonio, TX

Hardhat members report an average 31% higher win rate in their first 60 days using the bid templates.

Female project manager in hard hat reviewing construction documents on site
$38k
Scope gap caught before award
40-person GC
The sub comparison template alone saved us from a $38k scope gap on a tenant improvement job. The GC I work for didn't catch it. I did.
SO

Sandra Okonkwo

Project Manager · Apex Build Group · Atlanta, GA

Hardhat members report an average 31% higher win rate in their first 60 days using the bid templates.

The math that keeps you whole — for less than one bad estimate.

Solo Operator

$39/month

One-truck crews and independent estimators pricing their first commercial jobs.

  • 40+ bid calculators (full access)
  • Lumber, concrete, MEP takeoff sheets
  • Markup optimizer + labor rate tables
  • Monthly new template drops
  • Private Discord — estimators only
Most Popular

GC Team

$89/month

Estimating teams at mid-size GCs who bid 5+ jobs per month and need everyone on the same sheet.

  • Everything in Solo Operator
  • Up to 5 team seats
  • Bid comparison + sub scope gap templates
  • Commercial takeoff checklist (87 items)
  • Priority support + quarterly template audits

Unlock the Full Toolbox

Join 3,400+ contractors already bidding smarter. Your first month is risk-free.

Cancel anytime · No annual commitment required

Download the Free Estimator

The same wood-frame bid calculator from the header — yours as a Google Sheet, no membership required. Just drop your email.

Lumber takeoff with species + waste factor
Labor cost calculator (3 wage tiers)
Overhead + markup formula pre-loaded
Outputs a single bid number you can use today

No credit card. No sales call. Just the sheet.

3,400+
Active members
40+
Live tools
94%
Retention rate